INTERLOCKING ASSEMBLY SLIDER
0%
拖动滑块模拟板材推入。观察母口卡槽如何平滑滑过并彻底包裹金色螺栓,达到外部 0 穿孔外露。
INSTALLATION SEQUENCER (3 STEPS)
Torque: -- Nm
STEP 1 OF 3
Purlin Alignment & Panel 1 Base Placement
Position Panel 1 flush against the structural C/Z steel purlin. Verify laser level alignment across the vertical datum line.
Tolerance: ±1.0 mm
Verticality: ≤ L/1000